Public Projects

Trout Creek

MT-200 and MT 56

Slope Flattening project –

Located NW of Trout Creek on Hwy 200/P-6 between RP 17.7 and RP 18.2 (Site #1) and 10 miles SE of Troy on Hwy 56/P-56 between RP 26.5 and RP 26.9 (Site #2). This project consists of Grading, PMS overlay, installing panel delineation, standard delineation, guardrail/slope flattening, curve warning signs and an actuated flasher on the SF 159. Expected date range: June 24 through July 31, 2019.

Swamp Creek

US-2 - Mile Marker 48.5 to 53.8

Swamp Creek - 16 miles East of Libby.

Road reconstruction: Detour bridge; ALL OVERWEIGHT VEHICLES will be RESTRICTED from using the detour. Carriers who exceed legal weight limits need to seek an alternate route. 55 MPH speed limit through project work zone. 25 MPH speed limit on detour bridge. Expect lane shift with travel on gravel surface. Motorcycles advised to seek alternate route and use caution on gravel/milled surface. Expect single lane traffic across the new bridge deck, controlled by signal lights until June 10th. Expect minor delays through this area.

EXPECT: Reconstruction activities; Width Restriction of 12 feet; Delays between 10 and 15 minutes; Detour; Reduced Speeds varying from 25 to 55 MPH; Pilot Cars; Gravel Surface; Single Lane Traffic; Traffic Control by Signal Lights; Motorcycles Consider Alt Route.