Swamp Creek East HWY Construction
Montana Dept. of Transportation
Year
2018
Location
Libby, Montana
Service Type
- Grading
- Gravel
- Highway Reconstruction
Project consisted of grading, gravel, pms overlay, seal and cover, channel change, drainages, signing and 17 meter (56-ft) prestressed bridge on the Swamp Creek -East project in Lincoln County. The project was located 15 miles SW of Libby on US 2 (N-1) beginning at RP 48.5 and continuing southeast 5.3 miles to RP 53.8.
Downloadable PDF