Skip to main content

Swamp Creek East HWY Construction

Client

Montana Dept. of Transportation

Year

2018

Location
Libby, Montana
Service Type
  • Grading
  • Gravel
  • Highway Reconstruction
Project consisted of grading, gravel, pms overlay, seal and cover, channel change, drainages, signing and 17 meter (56-ft) prestressed bridge on the Swamp Creek -East project in Lincoln County. The project was located 15 miles SW of Libby on US 2 (N-1) beginning at RP 48.5 and continuing southeast 5.3 miles to RP 53.8.
Downloadable PDF